Why a whole house is priced differently
Painting a full house interior is not just several single rooms added together. Some time is saved because setting up and protection happen once and work moves between rooms while paint dries. Other things only appear on whole-house jobs, such as a long run of skirting through every room, a dozen doors, and the hallway, stairs and landing tying everything together.
What is included
A typical 3 bedroom house might have a living room, kitchen, bathroom, three bedrooms, and the hall, stairs and landing. Some people want everything painted; others leave the kitchen or bathroom for later. Deciding whether ceilings are included, whether all woodwork is repainted and whether any walls change colour is the first step to a clear quote.
The hallway, stairs and landing
This is often the single biggest space. The stairwell wall can be very tall, needing a platform or specialist ladders. There are usually several doors opening onto the landing, banisters and spindles that take hours of brushwork, and walls that have taken years of scuffs. The cost to paint the hallway, stairs and landing can be a big share of the total, which is why it has its own page.
Skirting boards, doors and frames
Woodwork runs through every room. The cost to paint skirting boards depends on their length, height, condition and whether old gloss needs sanding back or the colour is changing. Doors add up quickly too: each one has two faces, edges and a frame. Many homeowners refresh all woodwork at once so it matches throughout.
Condition of the walls
Older houses often have more cracks, patch repairs and uneven areas, while newer houses tend to have plasterboard walls that show dents and nail pops. A house that has not been decorated for many years usually needs more preparation in every room than one painted recently.
Empty or lived in
An empty house before moving in is the fastest to paint, because there is nothing to move or protect. In a lived-in home, rooms are cleared and covered one at a time, which adds some time but means you can keep using the rest of the house.
Phasing the work room by room
If doing everything at once is too much, a whole house can be split into phases. A common approach is to do bedrooms first, then the living spaces, and the hall, stairs and landing last, because that area gets knocked as furniture is moved through it. Phasing spreads the cost, though it can mean a little more set-up time overall. When asking for house painting quotes, mention if you want the work phased so it can be planned that way.
Choosing colours for a whole house
Picking a small set of colours that work together through the house makes the job simpler and gives a calmer feel. Many people use one neutral for hallways, landings and connecting spaces, then vary the colour in individual rooms. Keeping one woodwork colour and sheen throughout helps everything tie together. Fewer colours also means less paint left over and fewer separate batches to buy.