LJAY’s Painting & Decorating
Plasterboard Ceiling Installation and Overboarding
Old or cracked ceilings overboarded or replaced.
Professional home finishes
Made to look right—and last.
When a ceiling is badly cracked, sagging or made of old lath and plaster, patching it rarely lasts. A new plasterboard ceiling gives a flat, sound surface again. The main choice is whether to overboard the existing ceiling or take it down first, and that decision shapes the mess, the time and the price.
Overboarding versus taking the ceiling down
Overboarding means fixing new plasterboard straight through the old ceiling into the joists above. The old surface stays in place, so there is far less dust and debris, and the room is out of use for a shorter time. It works well when the old ceiling is cracked or uneven but still firmly attached.
Taking the ceiling down is the better route when the old plaster is loose, bowing, water damaged or so heavy that adding more weight is unwise. Lath and plaster ceilings that are sagging away from the joists usually fall into this group. It is messier, but it lets the joists be checked and gives a clean start.
How the new ceiling is fitted
Joist positions are marked so every board is screwed into solid timber at close centres. Boards are staggered so joints do not line up, and cut neatly around light fittings and the loft hatch. Once fixed, the ceiling is either taped and jointed or, more often, skimmed so it reads as one smooth surface, and then painted.
Ceiling lights and smoke alarms need disconnected and refitted by an electrician, so it is worth booking them in around the boarding.
What affects the cost of a plasterboard ceiling
The size of the room is the obvious factor, but several others matter. Taking down an old ceiling adds labour and waste disposal. High ceilings or stairwells need towers or extra access equipment. Many light fittings, downlights or coving to remove and replace add time. The finish also counts: skimming the new boards takes longer than taping joints, though it usually gives a better result under strong light.
A quote is based on seeing the ceiling, so photos of the cracks or sagging help Louise give an accurate price.
Keeping disruption down
Furniture is moved or covered, floors are protected, and with overboarding the dust is mostly limited to cutting and sanding. If the ceiling only needs a fresh smooth surface rather than new boards, ceiling skimming may be all that is required.
Choosing the right board
Standard plasterboard suits most living rooms and bedrooms. Moisture-resistant board is used in bathrooms and kitchens where steam is an issue. Fire-rated board may be needed under some floors or between a garage and the house, and acoustic board helps reduce noise from the room above. Thicker boards also span joists more rigidly, which helps where joists are widely spaced. The right choice depends on the room, and it is agreed before the job is priced.
FAQs
Common questions
- Should I overboard or pull down an old ceiling?
- Overboard if the existing ceiling is sound and well fixed, even if it is cracked. Pull it down if it is loose, sagging, water damaged or crumbling, because new boards need something solid to fix through.
- How much mess does a new ceiling make?
- Overboarding makes relatively little mess. Taking a ceiling down creates a lot of dust and debris, so the room needs cleared and sealed off from the rest of the house.
- Can lath and plaster ceilings be overboarded?
- Often, yes, if the lath is still firmly fixed. Where the plaster has come away from the laths, removal is usually the safer option.
- Is a new plasterboard ceiling painted straight away?
- Not until the skim or joint filler has dried. It then gets a mist coat before the finish coats.
Have a project in mind?
